Additions & Expansions
More space without moving — designed, permitted, and built by the same crew that manages your property.
Build Out, Not Up. Or Up. We Do Both.
Moving is expensive. A well-designed addition gives you the space you need while keeping the neighborhood, the schools, and the equity you've already built. Forge Point plans and builds residential additions of all types — bump-outs, room additions, sunrooms, above-garage buildouts, and second-story additions.
Every addition starts with a detailed scope and permit drawings. We coordinate with structural engineers where required, pull all necessary permits, and schedule inspections from foundation through final. No gray-area work that creates problems at resale.
Our project management approach means you have a single point of contact from design concept through move-in — not a general contractor managing a rotating cast of subcontractors you've never met.
What's Included
Room Additions
Full room additions from foundation or slab through finished interior — new bedrooms, home offices, family rooms, and flex spaces.
Bump-Outs & Pop-Tops
Smaller structural expansions that maximize existing footprints — kitchen bump-outs, master bath expansions, entry additions.
Above-Garage Buildouts
Convert underutilized above-garage space into finished living area, home office, or bonus room. Structural assessment included.
Sunrooms & Three-Season Rooms
Insulated and non-insulated sunroom additions with proper foundation, framing, glazing, and finish work.
Structural Engineering Coordination
For additions requiring structural engineering sign-off, we coordinate with licensed engineers and incorporate drawings into the permit set.
Permit Management
We pull permits, schedule all required inspections, and deliver a closed permit on every structural addition. No open permits at resale.
Foundation & Site Work Coordination
Excavation, concrete, and foundation work coordinated with licensed civil contractors where required.
Get in touch: forgepointproperties.com/contact · (720) 419-1961
Updated on: 29/04/2026
Thank you!